Widgetized Section

Go to Admin » Appearance » Widgets » and move Gabfire Widget: Social into that MastheadOverlay zone

THAI Technical Department at Don Mueang Reopens

 

Mr. Piyasvasti Amranand (2nd left), THAI President, said the THAI’s Technical Department in Don Mueang has reopened after the heavy flooding which resulted in temporary closure as of 26 October 2011 until now. As floodwaters have receded and the situation has returned to normal, THAI’s Technical Department in Don Mueang resumed normal operations beginning on 6 December 2011. THAI’s Technical Department will be ready to conduct all heavy maintenance services starting on 19 December 2011. At the opening ceremony Flight Lieutenant Montree Jumrieng (left), THAI Executive Vice President of Technical Department, opened THAI’s maintenance facilities to the press for inspection.

You must be logged in to post a comment Login